Fauquier County’s 2018 plan for Calverton says an extensive floodplain runs through the middle of the village. The roads around it show where the water collects. NOAA’s storm records have Bastable Mill Road shut by high water four times from 2014 to 2024, at Turkey Run and near Brookfield Drive, Bristersburg Road closed near Licking Run in August 2018, and part of Route 28 near Calverton closed by a flash flood in May 2012.
The village sits at about 257 feet, and a volunteer gauge about five miles east puts the yearly rain near 46 inches. In low ground near a floodplain, a basement can take water from under the floor as readily as through the walls, so a Calverton pump often works hardest in a long wet spring.
Where the pump’s water ends up matters more here than most places. On the County’s Catlett and Calverton sewer, the STEP guide prohibits hooking floor drains or roof drains to the system and asks owners to keep rainwater out of it, so a sump line that empties into a floor drain or a laundry sink can send groundwater to the County’s tank. On septic, that same water lands on the drainfield, and failing drainfields are the reason the County brought sewer to Calverton at all. The discharge belongs on open ground, sloping away from the house, the field and the well.
Storms here tend to take the power along. In the March 2018 nor’easter, Fauquier County’s 911 center was called about 1,100 times, mostly for trees and wires, and in August 2024 winds near 64 mph brought down numerous trees near Calverton. When the lines drop, the sump pump stops, the well pump stops, and on a hooked-up house the STEP pump stops too; the County says that tank holds about a day of light use. A battery backup keeps the sump going: with a new pump, the pair is $3,200 installed.